Y-Tool Bypass System With Wireline Entry Guide Or X-Over
System 02: Y-Tool Only Completions
- Wireline Entry Guide (or X-over)
- Motor Base Plug
- Bypass Clamp
- ESP Gauge
- Flush Joint Bypass Tubing
- ESP Motor
- MLE Cable
- ESP Seal Protector
- ESP Pump Intake
- ESP Pump
- Discharge Pressure Sub
- Discharge Head
- Pump Sub
- Telescopic Swivel
- Bypass Nipple & Blanking Plug
- Y-Tool
- Top Nipple
- Handling Sub
- Production Tubing Connection
The Y-tool system allows intervention below the ESP without the need to pull the ESP system.
The bypass tubing can also be used for natural flow periods and stimulation by either isolating the ESP automatically with a Y-valve or using a slickline deployed isolation sleeve.
In addition to this a sliding sleeve with nipple can be used with a jet pump to provide backup production if the ESP fails to allow continuation of production until a workover can be performed.
Applications Include
- Wireline logging below the pump
- Coiled tubing logging below the pump
- Retrieval of plugs below the pump
- Memory gauge deployment below the pump
- Backup production with a jet pump when the ESP fails
- Bridge plug setting for water shutoff
- Tubing-conveyed perforating gun deployment and detonation below the pump
- Well stimulation through coiled tubing or by-pass tubing (scale squeeze, acidizing, water ingress treatment)
- Wireline perforating below the pump
- Bottom hole samples deployment